| |
|
|

|
 |
• Small system size
• Moderate investment;
• Drying and baking stages occur in the same furnace;
• Large pre-treatment and coating area thanks to which it is possible to reach the items easily in any position;
• Wide booth opening for items load and unload
• The pre-treatment products recovery system keeps the booth area clean constantly, minimizing cleaning and product recovery times.
• Short cleaning times of the booth from the dust;
• Large container separated from active areas for degreasing products and paints supply;
• The system is equipped with a control board to manage pre-treatment products and coating devices, which are easy to reach from inside the booth;
|
| |
The system is available in different versions:
• 1m modularity which enables coating items up to 6 m long;
• Dust recovery system with cyclone separator and dust eliminator
• Liquid coating system
• Conveyer with 150 Kg/bar or 300 Kg/bar hanging load;
|
|
|
|
Euroimpianti s.r.l. Via Cavour, 44 - 37067 Valeggio sul Mincio (Verona) Italy - Tel. +390457950777 Fax. +390457950026 P.IVA, C.F. e numero iscrizione Registro delle Imprese di Verona 00618650238 REA 146190 - Capitale Sociale i.v. € 100.000,00 |